Fiberglass Shower Pan Preparation

JOB SITE REQUIREMENTS
  • Pitched plywood substrate to flush mounted Oatey PVC shower drain
  • 8” dry fir blocking between wall studs NO ACQ
  • 3 2x4 high curb 

Shower pans are required to be sloped to drain prior to waterproofing application.

Please advise if slopped base will be provided at site.

All blocking 8” min must be installed prior to scheduling. 

Fiberglass membrane is hand laid to the area, A solid surface is required on all areas to be waterproofed.

EASTERN FIBERGLASS COMPANY, LLC
PHONE: 732-610-4502
FAX: 732-410-7828
[email protected]
Picture
Picture
Picture
Picture
Picture
  • Home
  • About
  • Products
    • Decks
    • Shower Pans
    • Composite Railings
  • Product Information
    • Fiberglass Deck Preparation
    • Deck Architectural Drawings
    • Shower Pan Preparation
  • Contact
  • Pay Invoice